Skip to main content

Why drilling can feel quiet in a busy gas basin


Recent reports point to uneven rig and crew demand across southern Queensland, even as operators keep drilling and commit to new projects.

A crew between campaigns can feel the slowdown long before it shows up in a production report. Operators report gas delivered, wells drilled and capital committed. Contractors are looking for the next contract start, rig move or call to mobilise. Those measures run on different timetables.

Origin reported that Australia Pacific LNG drilled 32 operated development wells and commissioned seven in the September 2026 quarter across its reported field groups. Those two counts measure different stages of work, and the commissioned wells need not come from the same drilling cohort. Shell QGC’s August investment announcement covered 137 new Western Downs wells to be connected to existing infrastructure, with gas expected from 2027. Arrow’s separate Surat Gas Project Central was scheduled to begin its first stage in the second half of 2026, with first gas targeted for 2028. Each programme creates work at different points for drilling, completions, civil crews and gathering contractors. 

Contractors’ national figures also show a mixed picture. Ensign expected to hold at four working Australian rigs in the fourth quarter. Total Energy Services reported 912 Australian contract-drilling operating days in the September quarter, up from 857 a year earlier. Those days include paid standby, and neither disclosure isolates the Surat Basin. At the exploration end, Geoscience Australia describes national petroleum exploration spending as around a third of its level a decade earlier. That longer trend helps explain the thinner exploration pipeline but measures a different market from development drilling. 

The most defensible reading is that campaign timing and the mix of work can create genuine gaps for individual crews. Public reports cannot pin the lull to one cause or establish a current basin-wide rig count. For training coordinators, a gap between campaigns is a chance to check expiry dates and book the people who will be hardest to release once work resumes.

Check drilling well control courses · Plan short-course refreshers · Browse drilling and well servicing qualifications